STATUS: PRE-CONSTRUCTION · SITE A UNDER EXCLUSIVITYNODE: VASILIKOS-01 — 34.7246°N, 33.2247°ECAMPUS: RISC-V PHASE 1 · MULTI-SILICON EVAL · PLANNEDPOWER: 42MW ON-SITE GENERATION · DESIGN TARGETSTATUS: PRE-CONSTRUCTION · SITE A UNDER EXCLUSIVITYNODE: VASILIKOS-01 — 34.7246°N, 33.2247°ECAMPUS: RISC-V PHASE 1 · MULTI-SILICON EVAL · PLANNEDPOWER: 42MW ON-SITE GENERATION · DESIGN TARGET
AGICY.AI
StackTechnology OverviewRISC-V sovereign stackComputeBare-metal EU compute
FacilitiesData CentersVasilikos campusSustainability100% renewable mission
HardwareTenstorrent GalaxyPhase 1 Blackhole fleet (pre-COD)AESOLAR AlpineEnergy stack · hail-class PV + BESSAMD HeliosPhase 2 open rack-scale (eval · pre-COD)Taalas HC1Phase 2+ · model-hardwired ASIC (watchlist · pre-COD)CerebrasPhase 2 · wafer-scale eval (pre-COD)IBM z17 / LinuxONE 5Phase 2+ · trusted AI next to data (pre-COD)d-Matrix CorsairPhase 2–3 · on Watchlist (pre-COD)AWS Trainium 4Phase 2+ · custom XPU watchlist (pre-COD)
Submit your Hardware for reviewPropose accelerators for the Vasilikos fleet
GatewayCopperwayEU-sovereign OpenAI-compatible gatewayTry PlaygroundNewLive Copperway demo · PII vaultSovereign Exchange5-year cross-org sovereign planFor BuildersWhat developers can run today
ProductsReserve CapacityPre-construction LOI tiersMarketplaceCompute marketplaceGPUs Rent LiveLiveEU partner GPU now · until CODCompute VouchersSovereign compute creditsModel LeaderboardFrontier model rankingsPricingSubscription tiers
SolutionsInferenceProduction inferenceTrainingtt-train · planned campusFine-TuningLoRA, PEFT, domain modelsSovereign CloudEU-jurisdiction cloudAgentic PlatformAutonomous AI agentsReadinessPublic-data AI readiness scan
IndustriesFinancial ServicesRegulated finance AIHealthcareClinical & life sciencesGovernmentSovereign govt workloadsSemiconductorsFab & EDA data, EU-residentEnergyGrid & generation forecastingUtilitiesNIS2 essential entitiesPublic SectorCivil & public benefitProcurementLawful tender criteria
PricingTiers
Capital & EducationInvestInstitutional data room & deal flowAcademyAI training programs
Individuals & Family OfficesLiving in EUNewClass B capital allocation · no visa framingInternationalNewPlan B · equity alternative to propertyGreece Golden Visa€250k / €400k / €800k bands · vs Class BCyprus Permanent ResidenceReg. 6(2) parallel counsel · vs Class B
IntelligenceResearchPublications & portalsPublic-Record DeskGEMI registry · filings · courtsData CentersVasilikos campus briefing
CompanyAboutBrand · HoldCo targetMissionCharter & sovereigntyTrust CenterSecurity portal · docs · status
Schedule Briefing
Sign In
§ 01StackMulti-ISA§ 02PhilosophyOpen arch§ 03ZonesTrain + infer§ 04Silicon8 silicon lanes§ 04bFootprintGalaxy · NVL72§ 05BenchmarksPerformance§ 06FacilityVasilikos§ 07Phase 2Helios · Taalas · Cerebras§ 08Co-designClients§ 09DevelopersSDK + certs§ 10ReviewSubmit silicon§ 11DeployNext steps

§ 01 Sovereign AI Stack · 1,801 planned

Planned multi-silicon AI factory

As of August 2026 the Vasilikos campus is pre-construction. Phase 1 CapEx is Tenstorrent Galaxy RISC-V inference. Later halls evaluate AMD Helios, Cerebras CS-3/CS-4, IBM z17, Trainium 4, and photonic fabrics — mixed ISA, vendor-agnostic, no exclusive lock-in.

Planned Galaxy servers · TARGET
1,801
Planned RISC-V chips · TARGET
57,632
CY meter (1 Galaxy = 1 CY) · MODELED
540K tok/s
Power per server · DESIGN
8–10 kW
Air-cooled Galaxy PUE · TARGET
1.20
Architecture · TARGET
P1 RISC-V · mixed later
Reserve Capacity →
Tenstorrent Galaxy Blackhole — planned Phase 1 RISC-V inference server

§ 02 Philosophy · Open architecture

Demand-driven, not brand-driven

The AI silicon market is in rapid design churn — new XPUs, 3D-stacked inference chips, rack-scale open standards, and lightwave fabrics ship on 12–24 month cycles. AGICY evaluates and integrates the most efficient open-weight-compatible hardware per workload class. We do not sign exclusive, decade-long single-vendor infrastructure marriages: SRAs reserve capacity; the technology committee re-scores silicon each generation.

01

Efficiency First

We select silicon by tokens-per-watt and workload fit, not by brand logo. Galaxy, Cerebras, Helios, Trainium, and photonic paths compete on benchmarks.

02

Fact-Backed

Every hardware decision is supported by published benchmarks, vendor specifications, and internal validation testing.

03

No Vendor Lock-In

Open fabrics (OCP ORW, Ethernet, UALoE) and modular halls let us adopt Trainium 4, MI450, or lightwave switching when diligence clears — without rewriting the campus.

§ 03 Zone Architecture · Two planned zones

Two operating zones

Token Factory is planned RISC-V (Galaxy). Training Zone is mixed ISA on evaluation — Helios GPUs, Cerebras wafers, Trainium XPUs. Not two RISC-V halls.

Training Zone

Dense model training, fine-tuning, and research workloads.

HARDWARE
AMD Helios eval (Phase 2) + Cerebras CS-3 / CS-4 (announced 18 Aug 2026 · not ordered) + future Trainium-class XPUs
WORKLOADS
Foundation model training (100B+ params)
Enterprise fine-tuning (LoRA, QLoRA)
Research experimentation

Token Factory

Real-time inference serving at scale. Planned output is tokens — a token factory, not a storage warehouse.

HARDWARE
Tenstorrent Galaxy fleet (Phase 1) + d-Matrix Corsair decode (Watchlist) + photonic fabric eval
WORKLOADS
Production API serving
Real-time chat & assistants
Batch processing & embeddings

§ 04 Heterogeneous Fleet · 8 silicon lanes

Multi-silicon factory — Galaxy + Cerebras + open eval queue

Phase 1 and Phase 2 anchors receive equal architectural weight. Additional lanes (AMD Helios, Taalas HC1, AWS Trainium 4, photonic fabrics) stay on the technology committee watchlist until independent EU workload validation completes.

Tenstorrent GalaxyPhase 1 (Day 1)

Tenstorrent Galaxy

RISC-V · Blackhole

32 Blackhole chips per server · 300W TDP each

BEST FOR Inference at Scale

Phase 1 CapEx anchor: Galaxy air-cooled inference at ~$110K per server (vendor public price). 16 Linux-capable RISC-V cores + ~752 baby RISC-V cores per chip; matrix compute is Tensix engines — not Helios, not Cerebras. Campus is pre-construction.

AMD Helios · MI450Phase 2 (Evaluation)

AMD Helios · MI450

OCP Open Rack Wide · CDNA

Up to 72 MI450 GPUs per liquid-cooled rack

BEST FOR Open Rack-Scale Training & Inference

Phase 2 open-rack priority: Meta ORW v3 with UALoE scale-up — volume target H2 2026. Evaluated on workload fit and EU supply chain; no exclusive AMD commitment.

Taalas HC1Phase 2+ (Watchlist · AMD deal announced)

Taalas HC1

Model-hardwired ASIC · TSMC 6nm

Llama 3.1 8B cast into silicon · ~53B transistors

BEST FOR Fixed-model ultra-throughput inference

Technology demonstrator that hardwires Llama 3.1 8B instead of streaming weights from HBM. Vendor-claimed ~17k tok/s/user. AMD announced a definitive acquisition agreement (6 Aug 2026) — subject to closing. Primary source: https://newsroom.amd.com/news/amd-acquires-taalas-ai-inference/. Not Phase 1 CapEx; not a Galaxy substitute.

Cerebras CS-3 / CS-4Phase 2 (Watchlist · CS-4 announced, not ordered)

Cerebras CS-3 / CS-4

Wafer-Scale · 4T Transistors / wafer

CS-3: one WSE-3 · CS-4: three WSE-3 Turbo (announced 18 Aug 2026)

BEST FOR Training + High-Throughput Inference

Phase 2 wafer-scale lane: CS-3 WSE-3 with 44 GB on-wafer SRAM, plus CS-4 Nexus (three WSE-3 Turbo wafers, not a WSE-4 die). Not an owned Phase 1 fleet. CS-3 vendor-claimed ~1,800 tok/s on Llama 70B-class; CS-4 vendor-claimed up to 2× vs CS-3 on Cerebras’ comparisons.

IBM z17 / LinuxONE 5Phase 2+ (Watchlist)

IBM z17 / LinuxONE 5

Telum II · on-chip AI + Spyre

Single-frame and rack-mount · GA 12 Aug 2026

BEST FOR AI next to core transactions (fraud, payments, regulated data)

IBM GA 12 Aug 2026: smaller-footprint z17 and LinuxONE 5. Different job than Galaxy — inferencing beside the ledger, not campus GPU training. US vendor; customer-owned iron ≠ CLOUD Act-proof. Quote-only; no endorsement.

AWS Trainium 4Phase 2+ (When Available)

AWS Trainium 4

Custom XPU · Annapurna Labs

UltraServer clusters · FP4 native

BEST FOR Cost-Optimised Training at Hyperscale

AWS targets broad availability ~2027 with ~3× FP8 vs Trainium 3, NVLink Fusion hybrid options, and ~288 GB HBM — tracked for EU-compatible deployment paths, not day-one procurement.

d-Matrix CorsairPhase 2–3 (Watchlist)

d-Matrix Corsair

Digital In-Memory Compute

Dual-chiplet PCIe card · TSMC 6nm

BEST FOR Sub-2ms Latency Inference Decode

On Watchlist for decode-phase latency — digital in-memory compute with 4,800 TFLOPS MXINT8 and 300 TB/s on-chip bandwidth. Evaluated alongside wafer-scale and rack-scale paths; no exclusive commit.

Photonic & Lightwave FabricPhase 2+ (Evaluation)

Photonic & Lightwave Fabric

Optical Circuit Switching

Vendor-agnostic · PCIe / fabric attach

BEST FOR Higher Effective Tokens / Watt

Industry moving beyond electrical switches: Oriole PRISM (AMD collab), Q.ANT photonic NPUs, and 3D photonic tensor research (e.g. SKYLIGHT) target idle-GPU reduction and tokens-per-watt — evaluated as fabric layer, not religion.

§ 04b Footprint · Galaxy · NVL72

Comparable floor footprint. Not the same cabinet.

A Tenstorrent Galaxy is a 32-chip Blackhole mesh in 6U — approximately 19,200 mm² of silicon at ~600 mm² per die (roadmap neighbourhood; die area, not core area), drawing 8–10 kW operating and air-cooled. Seven occupy 42U of rack space at $770,000 public list and roughly 63 kW IT, before top-of-rack switching. One NVIDIA GB200 NVL72 is a purpose-built liquid-cooled rack at ~$3,000,000 analyst mid (band $2.0–3.4M) and 120+ kW, occupying a comparable floor footprint. Campus is PRE-CONSTRUCTION. Executed offtake is 0.

Tenstorrent Galaxy6U server

$110,000

Public list · per 6U server · 8–10 kW operating · ~12 kW max

42U of rack space before ToR7 × Galaxy · $770,000~63 kW IT · air-cooled · not seven-plus-switching in one 42U drop-in
  • 32 Blackhole · ~19,200 mm² silicon (~600 mm²/die)
  • 16 Linux-capable RISC-V cores + ~752 baby RISC-V cores per chip; matrix compute is Tensix engines
VERIFIED · tenstorrent.com · Apr 2026
NVIDIA GB200 NVL72purpose-built rack

~$3,000,000

Analyst mid · per rack · band $2.0–3.4M

Comparable floor footprint1 × NVL72 · ~$3,000,000120+ kW liquid · purpose-built MGX rack, not a 42U Galaxy drop-in
ESTIMATE · analyst est. $2.0–3.4M band

Hardware list price for that footprint: $770,000 versus $2.0–3.4M — a 2.6× to 4.4× spread on purchase price alone. That is not a claim that either produces the same number of tokens. Cost-per-token is the thesis; same-model, same-precision benchmarks are in progress. Planned output is tokens — a token factory, not a storage warehouse. Logging and provenance are designed to support customers' EU AI Act Article 12 record-keeping obligations. Hosting compute does not make AGICY the provider of a customer's high-risk AI system. Standalone Annex III high-risk obligations apply from 2 December 2027 (Digital Omnibus).

§ 05 Performance · Labeled bases · Aug 2026

Inference throughput & economics

Four figures, four bases — do not mix them. The retired 400B dense ~2,500 tok/s (2.5× unnamed GPU) row is gone: it collided with vendor-class DeepSeek-R1 671B (~350–400 tok/s/user). Campus is pre-construction. Nothing here is a live meter.

FigureValueBasis
CY meter / server300 tok/sMODELED commercial meter: 1 Galaxy treated as 1 CY. Same spine as 17T/yr.
CY meter / Phase-1 fleet540K tok/s1,801 × 300 = 540,300. MODELED — not a live meter.
SC-36 blended / Galaxy~6,649 tok/sMODELED theoretical blended. Fleet ~378T/yr on the homepage. Not 100% utilization. Not the CY meter.
DeepSeek-R1 671B / user~350–400 tok/sVendor-class / research citation — not AGICY lab. Not a 400B dense class row.

ECONOMICS — STRUCTURE, NOT THIRD-PARTY MARGIN PERCENTS

Operator classHow compute is paid for
AGICYPlans to own the campus iron (pre-construction). Executed offtake is zero. Return math stays under NDA.
Frontier labsTypically lease hyperscaler GPU. Public margin figures are not AGICY-measured and are omitted here.
GPU clouds / coloRent or colo GPU systems. Different stack than planned Galaxy air-cooled halls.

§ 06 Sovereign Infrastructure · Pre-construction

Planned self-powered campus. Air-cooled Galaxy racks. EU-sovereign.

Renders and energy cards are the planned Vasilikos campus as of August 2026 — not a live hall. Phase 1 Galaxy racks are air-cooled (zero water at the rack). Campus PUE 1.20 TARGET is the facility envelope — a seawater-plant design target on the homepage, not a claim that Galaxy servers are water-cooled. Behind-the-meter generation is a design target — not ordered. Phase 2 Helios / Cerebras halls would be liquid-cooled if procured.

AGICY planned Vasilikos campus — aerial concept, pre-construction
Server Hall (concept)

Server Hall (concept)

Planned 1,801 Galaxy racks · 57,632 RISC-V chips · campus is pre-construction

NOC / SOC (concept)

NOC / SOC (concept)

Planned 24/7 monitoring of compute, power, security and network

Visitor Lobby (concept)

Visitor Lobby (concept)

Sea-facing entrance — design target, not a live hall

Rooftop (concept)

Rooftop (concept)

Rooftop solar + amenity courts are a campus envelope TARGET on the 25,000 m² Site A parcel — not a claim that PV covers ~80% of the site, and not 42 MW generation (that is the Boom ISO TARGET, separate from roof PV)

Power Generation (planned)

Power Generation (planned)

Behind-the-meter generation is a design target — not ordered · investor briefing for MW model

Campus amenities (concept)

Campus amenities (concept)

Ground-level cafeteria and gardens under the elevated facility — design target

🏗️Pre-construction
Campus status

Vasilikos energy zone, Limassol — planned sovereign AI campus. No live halls, turbines, or meters.

🖥️1,801 Galaxy
Phase 1 fleet

Air-cooled RISC-V inference — Phase 1 CapEx anchor. Helios, Cerebras, and Taalas remain Phase 2+ evaluation.

❄️PUE 1.20 TARGET
Cooling design

Phase 1 Galaxy racks: air-cooled, zero water at the rack. Campus PUE 1.20 TARGET is the facility envelope (seawater plant design target) — not rack water cooling. Phase 2 liquid halls only if procured.

⚡Design target
Power posture

Behind-the-meter generation is modeled for investors — not ordered and not operational. Facility MW, fuel, and turbine diligence: investor briefing / data room.

Facility MW, fuel €/MWh, turbine slot, and HRSG diligence are in the investor energy model — not repeated on this public page. Investor relations →

§ 07 Phase 2 Planning · Vendor-agnostic roadmap

Phase 2 — Helios, Taalas, Cerebras, IBM z17, Trainium 4 & lightwave

Phase 1 deploys 1,801 Tenstorrent Galaxy servers for air-cooled sovereign inference. Phase 2 opens liquid-cooled training halls with AMD Helios / MI450 open racks first on the evaluation queue, then Taalas HC1 (model-hardwired inference · AMD acquisition agreement 6 Aug 2026 · not ordered · AMD newsroom), Cerebras CS-3 / CS-4 (CS-4 announced 18 Aug 2026 · not ordered), IBM z17 / LinuxONE 5 (on Watchlist), plus AWS Trainium 4 (~2027), d-Matrix Corsair (on Watchlist), and photonic fabrics. Nothing is procured on faith or exclusive vendor contracts.

Phase 1 · Tenstorrent Galaxy briefing

Planned Phase 1 CapEx — 1,801 Galaxy RISC-V servers. Campus is pre-construction. Cerebras CS-4 is announced, not ordered. We do not OCR or invent financials. This is Aphrodite, an AI agent — not a human spokesperson.

Cerebras CS-3 · Aphrodite Video Briefing (CS-3 footage · CS-4 on the hardware page)

Phase 2+ · Taalas HC1 product brief (vendor media · watchlist)

Model-hardwired Llama 3.1 8B demonstrator — vendor-claimed ~17k tok/s/user. AMD definitive acquisition agreement announced 6 Aug 2026 (subject to closing). AMD press release ↗. Not Phase 1 CapEx. Not AGICY lab measurement.

Taalas HC1 technology demonstrator board
Taalas vendor chart of tokens per second per user versus GPU baselines

Hardwired model silicon for fixed Llama 3.1 8B paths — complementary to Galaxy, not a substitute.

Taalas hardware page →

Phase 2 · Evaluation

AMD Helios · MI450

OCP ORW open rack · 64–72 MI450 GPUs · H2 2026 ramp · no exclusive AMD commit.

Helios hardware page →

Phase 2 · CS-4 announced · not ordered

Cerebras CS-3 / CS-4

CS-3 WSE-3 plus CS-4 Nexus (three WSE-3 Turbo wafers, 18 Aug 2026). Not WSE-4. Not owned Phase 1 fleet.

Cerebras hardware page →

Phase 2+ · Watchlist

IBM z17 / LinuxONE 5

Telum II + Spyre · AI next to the ledger · GA 12 Aug 2026 · not Galaxy CapEx.

IBM z17 hardware page →

Phase 2+ Evaluation Queue

Taalas HC1WATCHLIST

Model-hardwired Llama 3.1 8B · ~17k tok/s/user (vendor) · AMD deal announced · not CapEx

d-Matrix CorsairWATCHLIST

DIMC decode lane · sub-2 ms · Phase 2–3 · on Watchlist

AWS Trainium 4WATCH

Custom XPU · FP4 native · ~2027 GA · hybrid NVLink Fusion (reported)

Photonic / 3D inferenceRESEARCH

Lightwave fabrics + 3D memory stacking for tokens-per-watt

Submit your siliconCTA

Chip & system builders — propose accelerators for the Vasilikos review queue

Cerebras CS-3 · Wafer-Scale Engine (CS-4: see hardware page)

ChipWSE-3 — 4 trillion transistors
Cores900,000 AI-optimised cores
On-Chip Memory44 GB SRAM — no HBM needed
Memory Bandwidth21 PB/s on-chip
TrainingModels up to 24T parameters
Inference Speed~1,800 tok/s (70B open-weight class)
Fabric I/O12× 100 GbE SwarmX™

Cerebras vs Groq · vendor claims, not AGICY lab

Compiled from Cerebras and Groq public marketing (70B/8B open-weight class, 2024–2026 product pages). Not same-model, same-precision, same-date AGICY measurements. Do not treat as a ranking.

ArchitectureWafer-Scale (WSE-3)LPU (Tensor Streaming)
70B open-weight class~1,800 tok/s (Cerebras vendor)~250 tok/s (Groq vendor)
8B open-weight class~2,100 tok/s (Cerebras vendor)~750 tok/s (Groq vendor)
Training✓ Up to 24T params✗ Inference only
On-Chip Memory44 GB SRAM230 MB SRAM
Max Model Size24T parameters~300B (multi-chip)
Sovereign Deploy✓ On-premise SKUUsually GroqCloud API · not an AGICY SKU
Phase 1PLANNED

1,801 Tenstorrent Galaxy RISC-V (planned CapEx)

Inference · Fine-tuning · Marketplace

Phase 2PLANNED

CS-3 / CS-4 + Helios eval + liquid halls

Training · Foundation models

Phase 3ROADMAP

Hybrid multi-vendor + photonic fabric

Full-stack sovereign AI

Phase 1 · Galaxy thermal profile (air-cooled racks · planned · not a comparison)

MetricPhase 1 Galaxy (air, planned)
Chip TDP300W (Blackhole)
Server power8–10 kW operating · ~12 kW max
Cooling methodForced air (standard HVAC)
PlumbingNone for Phase 1 Galaxy
Water for coolingZero

§ 08 Sovereign Co-Design · Alliance intent

Clients participating in the design of new AI models

Through the Sovereign Compute Alliance, top-tier reserved-capacity clients (SRA L5 — the highest published reservation band) are intended to join architectural design, fine-tuning, and deployment of models once the campus is live. Campus is pre-construction. Images below are concept, not a current lab.

Model Co-Design Labs

Model Co-Design Labs

Mediterranean-style collaboration hubs for active model shaping

Transparent Operations

Transparent Operations

Full physical transparency into the silicon powering your sovereignty

§ 09 Developer Experience · Galaxy SDK · CS-3 vendor DX

Built for ML engineers, not infra teams

Phase 1 developers use Tenstorrent TT-Forge / TT-Metal. The table below is Cerebras CS-3 vendor-claimed DX for a possible Phase 2 wafer-scale lane — not the Galaxy compiler, and not a live AGICY cluster.

CEREBRAS CS-3 DEVELOPER EXPERIENCE (VENDOR-CLAIMED · NOT GALAXY TT-FORGE)

MetricCerebras CS-3 (Cerebras vendor marketing)Multi-node GPU (Cerebras vendor comparison)
Code for 175B-class training~565 lines (Cerebras vendor)~20,000 lines (Cerebras vendor GPU comparison)
Engineering team required3–5 ML engineers (Cerebras vendor)35+ systems engineers (Cerebras vendor GPU comparison)
Cluster managementSingle wafer-scale device (Cerebras vendor)Multi-node GPU orchestration (Cerebras vendor comparison)
Time to first inferenceHours (Cerebras SDK-native, vendor)Weeks (Cerebras vendor GPU comparison)

PHASE 1 GALAXY COMPILER & SDK (TT-*)

TT-Forge

High-level ML compiler — converts PyTorch/JAX/TF models to Tensix instructions automatically

TT-Metal

Low-level hardware interface — direct kernel programming for custom compute operations

TT-Budabackend

Runtime scheduler — manages chip-level execution, memory allocation, and data movement

CERTIFICATION TARGETS (NOT LIVE ATTESTATIONS)

TARGET

ISO 27001

Information Security

Target: Go-Live
TARGET

SOC 2 Type II

Trust Service Criteria

Target: Y1
DESIGN

GDPR

Data Protection

By Design
TARGET

NIS2

Network Security

Target: Go-Live
DESIGN

EU AI Act

AI Regulation

By Design
TARGET

Tier III

DC Uptime Institute

Target

§ 10 Hardware Review · Chip & system builders

Submit your chip or system for review

AGICY runs a vendor-agnostic evaluation queue for the Vasilikos campus. Phase 1 CapEx stays on Tenstorrent Galaxy. Phase 2 priority today: AMD Helios / MI450, then Cerebras CS-3 / CS-4 (CS-4 announced 18 Aug 2026 · not ordered), IBM z17 / LinuxONE 5 (on Watchlist), with Trainium 4, d-Matrix Corsair (on Watchlist), and photonic fabric lanes behind. Propose rack-scale, wafer-scale, decode, or fabric systems for committee review — no exclusive lock-in implied by a listing.

AMD HeliosCerebras CS-3 / CS-4IBM z17d-Matrix
Submit hardware for review →

§ 11 Ready? · Deploy on sovereign compute

Ready to deploy on sovereign compute?

Whether you're evaluating compute for your enterprise, planning an AI research programme, or investing in sovereign infrastructure.

◈ Schedule a Briefing →
Investor RelationsEnterprise Partnerships
AGICY planned sovereign compute — concept render, campus pre-construction

§ FIN — Close of Document

Ready to build on sovereign infrastructure?

Schedule a confidential briefing with our team. NDA-protected, no commitment.

Schedule a briefing →
EU JURISDICTION · CYPRUSGDPR ART. 28 DPA-READY · BY DESIGNNIS2-ALIGNED · BY DESIGNEU AI ACT ART. 12 LOGGING SUPPORT · BY DESIGNRISC-V NATIVE · OPEN ISA

Design-alignment statements for a pre-construction facility — not certifications or attestations. Basis: compliance FAQ, § 08. Careers: we aim for 50-50 gender balance across hiring cohorts.

AGICY.AI

Advanced Governance & Intelligence Cyprus

The sovereign architecture for the Cyprus mind.
Humanitarian mandate: civilian public benefit only — healthcare, education, civil resilience. Civilian / humanitarian mandate only.
VASILIKOS ENERGY CENTRE, LIMASSOL DISTRICT · PRE-CONSTRUCTION
34.7246°N · 33.2247°E
Principal campus: Cyprus Vasilikos (Phase 1). Parallel HoldCo path: sovereign compute project in Greece (TARGET / planning) — ~20 MW-class Tenstorrent / air-cooled inference positioning for EU diversification; separate CapEx, no offtake claimed.

The Ledger — monthly briefing
  • CopperwayEU-sovereign OpenAI-compatible gateway
  • Try PlaygroundNewLive Copperway demo · PII vault
  • Compression & PII vaultNewSovereign path controls in Playground
  • Sovereign Exchange5-year cross-org sovereign plan
  • For BuildersWhat developers can run today
  • Reserve CapacityPre-construction LOI tiers
  • MarketplaceCompute marketplace
  • GPUs Rent LiveLiveEU partner GPU now · until COD
  • Compute VouchersSovereign compute credits
  • Model LeaderboardFrontier model rankings
  • PricingSubscription tiers
  • Research HubPublications & portals
  • Public-Record DeskGEMI registry, filings, court decisions
  • Data CentersVasilikos sovereign campus briefing
  • Frontier AI EthicsSovereign alternative to frontier dominance
  • Cyprus Court DecisionsBilingual legal research feed
  • Intelligence DrainEU talent & compute outflow analysis
  • National Equity in AISovereign AI for smaller EU nations
  • Compiler-First ChallengeJim Keller thesis vs GPU orthodoxy
  • GDDR6 & Open InfrastructureGalaxy economics & sovereign TCO
  • Blackhole Performance RisksVendor benchmarks & due diligence
  • Security Audit ResearchCybersecurity methodology & findings
  • AI Readiness AuditExecutive readiness assessment
  • Readiness HubPublic-data scans & named assessments
  • ProcurementLawful sovereignty criteria for tenders
  • AboutProject identity & status
  • MissionCharter & sovereignty
  • CareersCulture, benefits & hiring ethos
  • Open PositionsEngineering, research & operations roles
  • Ethics & CharterAnti-misconduct & responsible AI
  • Editorial & MethodologySources, claims, corrections
  • Trust CenterSecurity portal · docs · status
  • InvestInstitutional data room & deal flow
  • Living in EUIndividuals & FOs · Class B allocation
  • International investorsPlan B · Greece / Cyprus rails · Class B
  • Equity participation (legacy)CY & GR individual interest · counsel-gated
  • AcademyAI training programs
  • ContactBriefings & inquiries
  • Privacy PolicyGDPR · data processing
  • Terms of ServicePlatform usage terms
  • Cookie PolicyTracking & consent
  • SRA TermsReserve capacity agreement
  • Gateway Pricing DisclaimerCopperway pricing basis
© 2026 AGICY· PROJECT / BRAND OPERATOR · PLANNED CYPRUS ENTITIES NOT YET INCORPORATEDDOC: AGICY.AI · REV 2.0 · SOVEREIGN LEDGER