Phase 1 power class

42 MW
On-site generation TARGET
DESIGN TARGET
Copperway is live · campus is planned · PRE-COD
Copperway prices and uptime, on a sovereign EU path. Planned Cyprus RISC-V campus — pre-construction.
How it works
Create an account to get started. You can set up an org for your team later.
Credits can be used with any model or provider.
Best AI platform. Discounted prices on the Copperway gateway — connect from anywhere.
Example API key, hidden§ 00 The Campus · Power · jurisdiction · COD
Phase 1 is a planned campus-class MW programme at Vasilikos — EU jurisdiction, air-cooled facility design, generation sized around modeled IT load. Design targets, not live MW. OEM and node counts publish when procurement locks.
Phase 1 power class

42 MW
On-site generation TARGET
DESIGN TARGETIT vs generation · never summed
16.2 MW
IT load · MODELED
42 MW
Generation · TARGET
Demand and supply are different quantities. IT load is what the plant is modeled to draw; generation is ISO nameplate TARGET. Neither is a live COD meter. Node count and OEM mix are deferred until procurement is firm.
DESIGN TARGETPower sized around the plant
IT and generation stated separately — never summed. DESIGN TARGET
§ · Platform · Live today · campus planned
AGICY is EU-sovereign AI infrastructure: a live gateway and catalog now, a Cyprus campus in pre-construction. That is not a US marketplace of 400 promo SKUs — it is jurisdiction, a PII vault, and planned offtake.
§ 01 The Drain · Threat analysis
€78.8M
Estimated annual AI seat spend — Cyprus + Greece legal & accounting workforce ESTIMATE
Eurostat LFS 2024 counts 20,200people in Cyprus legal & accounting activities (NACE M69) and 111,200 in Greece — 131,400 combined. At a blended €50/month professional AI seat, that is €78.8M/yr estimated. Separately, the “Cyprus 100” anchor clients model €183.3M/yr addressable AGICY demand.
Every AI request runs on US-controlled providers — and even their EU regions remain within reach of the US CLOUD Act. Economic value extracted permanently.
Every token generated on-island. Revenue stays in Cyprus. Institutional capital compounds. Design target: data stays in EU jurisdiction.
Eurostat LFS 2024 · NACE M69 · +111,200 Greece → 131,400 combined
VERIFIED§ 02 What we build · Campus power class
Phase 1 is sized in megawatts — on-site generation and IT load stated separately — for EU-jurisdiction sovereign compute at Vasilikos. Silicon OEM, unit counts, and list prices stay off this page until procurement is locked. Pre-construction; not a live hall.
42 MW
16.2 MW
§ 03 The Site · Vasilikos · power
SITE A · UNDER EXCLUSIVITY: 25,000 m² of waterfront in the Vasilikos Energy Centre— Cyprus's established industrial energy zone. Direct port proximity enables subsea fibre landing with zero terrestrial middle-mile. Campus PUE 1.20 is a seawater-plant design target (MSFD limits). Planning target of up to 260 MW EAC grid connection (not a granted offer or signed allocation) plus 42 MW on-site generation (design target, no order). Full EU jurisdiction. Target COD H2 2027 (target) — contingent on financing, permits, and grid; not a committed commercial date.

Modeled IT draw for the Phase 1 plant. Not summed with generation. OEM mix TBD.
MODELEDOn-site gas turbine ISO nameplate — supply, stated separately from IT demand.
DESIGN TARGET
CONCEPT RENDER
SITE TODAYPre-construction Site A. Same camera — the completed campus is a concept render, not a live facility.
COMPUTECONCEPT RENDERCampus-class MW programme planned for air-gapped, ring-fenced partitions. Designed so client data stays in the contracted residency zone. OEM and node counts publish at procurement lock.
ACADEMYCONCEPT RENDERA dedicated facility planned to upskill engineers in RISC-V architecture and LLM fine-tuning for the local workforce.
ENERGYCONCEPT RENDEROn-site gas turbine generation planned behind the meter. Y1–Y3 BTM fuel €178/MWh (MODELED); Y4+ €150/MWh planning (TARGET). Island-mode capable, H₂-ready — design target, not live generation. Not LCOE.
EXECUTED OFFTAKE = 0 · OPEN RESERVATION · NO CONTRACTED TAKE-OR-PAY
Later programme phases live on /technology. Demand and supply megawatts are never summed into one figure.
§ 04 The Mandate · Civilian public benefit
AGICY exists for healthcare, education, social services, humanitarian logistics, climate resilience, and inclusive economic development — civilian and humanitarian workloads only. The campus is planned as a people campus on industrial land: operators, engineers, Academy trainers, and client services alongside the fleet. Year-1 workforce planning is 152 FTE bottom-up — a local AI employment path, not a ghost warehouse.
Mandate locked by Golden Share and social-levy governance design. Headcount from workforce planning SSOT. DESIGN TARGET
§ 05 The Schedule · Key figures & basis
Infrastructure marketing usually asserts. AGICY discloses. The schedule below is how we publish Phase 1 numbers — value, basis, source, and epistemic status. What is verified is marked verified; what is a model is marked a model.
| Figure | Value | Basis | Source | Status |
|---|---|---|---|---|
| On-site generation | 42 MW | ISO nameplate TARGET for behind-the-meter generation. Never summed with IT load. OEM / node count deferred until procurement lock. | BP §3.2 · energy.yaml | DESIGN TARGET |
| Fleet IT load | 16.2 MW | What the compute plant is modeled to draw. Stated separately from generation — never summed. | BP §3.2 · TCO model | MODELED |
| EAC grid planning | 260 MW | Planning TARGET for connection capacity — not a granted connection offer or signed allocation. | BP §3.2 (TARGET) | DESIGN TARGET |
| Phase 1 CapEx | €462.2M | MANAGEMENT LOCK for the Phase 1 programme. Hardware OEM mix and unit list prices are not published on the homepage until procurement is firm. | BP §9 CapEx lock | DESIGN TARGET |
| Target COD | H2 2027 (target) | Pre-construction campus programme. Executed offtake today is zero. | BP · campus schedule | DESIGN TARGET |
| CY+GR professional AI seats | €78.8 M/yr | 131,400 legal & accounting workers (Eurostat LFS NACE M69, 2024) × €50/mo blended seat ≈ €150/min. | intelligence_drain.yaml | ESTIMATE |
IT load, facility wall draw, and on-site generation are stated separately by design — demand and supply are different quantities and are never summed into a single “compute power” figure on this site. Full schedule with arithmetic →
§ 06 The Record · Questions on the record
AGICY is operated under the AGICY brand by Advanced Governance & Intelligence Cyprus. The project is developing a RISC-V accelerator campus at the Vasilikos industrial zone and operating Copperway, an EU-jurisdiction LLM gateway. AGICY is not Agency. The campus is pre-construction; Copperway is operational — those two facts are always stated separately. Planned Cyprus jurisdiction is not the same as EU data residency on foreign infrastructure.
No. As of August 2026 the Vasilikos RISC-V campus is planned (pre-construction). Site exclusivity and design targets are not a live hall. Target commercial operation is H2 2027 — a design target, not a live facility claim. Concept renders on this site are labelled as such.
Copperway is the operational EU-jurisdiction LLM gateway: an OpenAI-compatible path with a PII vault. Copperway Playground is free to try with daily limits. It is not campus silicon. SRA reserves planned campus offtake; executed offtake today is zero. Leaderboard rankings are LMSYS Arena reference data, not AGICY-run evaluations.
Copperway is one OpenAI-compatible EU API for frontier text models, with a PII vault. The leaderboard indexes Arena reference rankings across text, agents, vision, image, and video — a catalog of rankings, not a claim that every modality is a live Copperway endpoint. Try text on the playground; reserve campus capacity via SRA.
AGICY's infrastructure is designed to satisfy the ICT third-party requirements that DORA (Digital Operational Resilience Act) imposes on regulated EU financial entities — and that national supervisors such as BaFin apply to institutions in their jurisdiction. The design includes contractual audit and inspection rights, physical EU data residency in Cyprus, DORA-aligned exit and portability provisions, and full sub-outsourcing transparency.
An AI API built for GDPR-regulated institutions must keep all processing physically and legally within the European Union. AGICY's Copperway is structured to avoid US CLOUD Act exposure — no US parent entity and no US-based processing in the chain — and is designed to run on ring-fenced sovereign infrastructure where client prompt data is never used for model training, protecting special-category financial and personal data.
Under the EU AI Act, most obligations attach to providers and deployers of AI models and systems — not to the underlying compute infrastructure. AGICY operates as sovereign infrastructure and is designed to support its clients' AI Act obligations: EU-only processing, technical documentation support, logging and traceability, and data-governance controls aligned with Articles 10–13.
§ 07 Access · Reserve · talk
Reserve sovereign-grade model compute toward a target H2 2027 delivery window — contingent on financing, permits, and grid; without surrendering data sovereignty. Executed offtake today = 0.
Telco, institutional, and workforce conversations — schedule a briefing and we route the right path.
PHASE 1 ALLOCATION ACROSS 12 PRICED SRA TIERS · INTEREST OPEN
§ 08 Investor path · Capital briefing
Institutional data-room path while Site A remains under exclusivity (PRE-CONSTRUCTION). Qualitative path only on this page — no MOIC, IRR, or contracted offtake claims here.
AGICY is operated under the AGICY brand by Advanced Governance & Intelligence Cyprus. This page does not constitute an offer to sell securities. Securities are offered only pursuant to definitive offering documents delivered to qualified investors under applicable exemptions (Reg D 506(c) for US persons; Reg S for non-US persons). Past projections are not guarantees of future performance.